Kennisbank
7 documenten gevonden
Verfijning
-
03 Parametric Estimating wPresentatie, Parametric Analysis
Parametric Analysis 05-01-2016 | Presentatie Auteur: Onbekend Parametric Estimating, Determine correlation, Parametric Estimating Extended, PE Challange, SEER SEM “Base” settings, SEER SEM “Environment” settings, Tunnel Safety System, External Validation Trefwoorden: Parametric Estimating, External Validation, “Environment” settings Bijgewerkt op: 05-01-2016 Bron: Parametric Estimating SEER presentation
26-11-2021 -
03 Parametric Estimation wPresentatie, Parametric Analysis
Parametric Analysis 05-01-2016 | Presentatie Auteur: Onbekend Parametric Estimating, Determine correlation, Parametric Estimating Extended, PE Challange, SEER SEM “Base” settings, SEER SEM “Environment” settings, Tunnel Safety System, External Validation Trefwoorden: Parametric Estimating, External Validation, “Environment” settings Bijgewerkt op: 05-01-2016 Bron: Parametric Estimating SEER presentation
19-11-2021 -
An Introduction to Parametric EstimatingPublicatie, Parametric Analysis
Parametric Analysis 21-11-2015 | Publicatie Auteur: Mr. Larry R. Dysert, CCC aACE International describes cost estimating as the “predictive process used to quantify, cost, and price the resources required by the scope of an asset investment option, activity, or project [1].” The methods and techniques used to prepare a cost estimate will typically vary based on the level of project definition available at the time the estimate is prepared [2, 3]. Early in a project’s lifecycle, there is a need to prepare conceptual cost estimates to support timely decision-making such as to make a “go or no-go” decision to continue development of a project proposal or to select between alternative designs. This paper is aimed at those wanting to explore the concepts of parametric estimating. Parametric cost estimating models are useful tools for preparing early conceptual estimates when there is little technical detail to provide the basis to support using more detailed estimating methods. This paper will introduce the concept of parametric estimating and discuss the steps involved in the creation of a parametric estimating model. Trefwoorden: parametric Bijgewerkt op: 21-11-2015 Bron: AACE
17-11-2021 -
Die 4cost – Lösung im Einsatz bei Liebherr in KirchdorfPublicatie, Parametric Analysis
Parametric Analysis 01-01-2009 | Publicatie Auteur: 4costs ABOUT Liebherr The Liebherr family business was founded in 1949 by Hans Liebherr. The great success of the first mobile, easy to assemble and affordable tower crane was the foundation of the company. Today Liebherr is not only one of the largest construction equipment manufacturers in the world, but is also recognized in many other areas as a supplier of technically demanding use,- oriented products and services. Meanwhile, the company has grown to a business group with more than 30,000 employees in over 100 companies on all continents. The decentralized group is divided into manageable, independently operating business units. This customer focus will also be secured as the ability to respond flexibly to the global competition to market signals. The manufacturing and distribution companies of various product segments are the operative management of the parent company. The corporate group, LiebherrInternational AG in Bulle, is situated in Switzerland. The Management and holder of the company are only members of the Liebherr Familiy. The family business is in its second generation, chaired by Isolde Liebherr and Willi Liebherr Trefwoorden: Liebherr, kirchdorf, towercrane Bijgewerkt op: 05-01-2016 Bron: 4costs
18-11-2021 -
Parametric Cost EstimatingPresentatie, Parametric Analysis
Parametric Analysis 04-03-2010 | Presentatie Auteur: Dale Shermon Parametric Cost Estimating What is it and how is it useful to you? ISPA / DACE 4th March 2010 Dale Shermon Senior Executive Consultant PRICE Systems Hook Hampshire UK Trefwoorden: cost estimating, Analytical, parametric, Parametric Cost Model Bijgewerkt op: 24-12-2015 Bron: TruePlanning by PRICE Systems
18-11-2021 -
The 4cost – solution at Rheinmetall Defence Electronik GmbHPublicatie, Parametric Analysis
Parametric Analysis 01-01-2009 | Publicatie Auteur: 4costs The 4cost – solution at Rheinmetall Defence Electronik GmbH About Rheinmetall The division of the Rheinmetall Defence Group is one of the prominently among the international defense and security industry. With approximately 7,200 employees generated Rheinmetall Defence annual sales of € 1.8 billion. As the leading European supplier of army technology, the company has a wide array of platforms and components, as single solutions as well as network system solutions. Rheinmetall Defence stands for longstanding experience and innovation in armored vehicles, weapons and ammunition, in the fields of air defense and electronics - and the requirements of the navy and air force in the area of internal security. The ability to integrate components into system solutions Rheinmetall Defence makes it a strong partner to the international armies and forces. Trefwoorden: rheinmetall, electronik, defence Bijgewerkt op: 05-01-2016 Bron: 4costs
18-11-2021 -
The 4cost-aces - solution in use at EADS Defence & Security in UlmPublicatie, Parametric Analysis
Parametric Analysis 01-01-2009 | Publicatie Auteur: 4costs EADS is a global leader in aerospace, defense and related services with annual sales of € 42.8 billion in 2009 and about 119,000 employees. The Group includes Airbus, the leading manufacturer of commercial aircraft, including Airbus Military, responsible for military tanker and transport aircraft. EADS also includes the world's largest helicopter supplier Eurocopter and EADS Astrium, the European number one leader in space programs from Ariane to Galileo. The division Defence & Security (DS) offers its customers comprehensive system solutions and makes EADS the major partner in the Eurofighter consortium and a stakeholder in the missile systems provider MBDA. In 2009, DS with around 21,000 employees generated total sales of € 5.4 billion. Trefwoorden: EADS, generated Bijgewerkt op: 05-01-2016 Bron: 4costs
18-11-2021
Partners



